The Boat Barn Web Page
Previous Page
-
Winter 2001-2
- It was a mild Winter in North Carolina
and sunny days brought the temperature in the Boat House into the 80's
and
sometimes in the late Winter into the 90's. It was bib
overalls
and no shirt most of the time.
-
- The step in the footwell made a
convenient place to put a shelf for odds and ends in the engine
Room.
The beams on either side of the footwell have been routed out for
wiring
which will supply two overhead lights mounted to the underside of the
deck.
PVC pipe along the underside of the sheer will carry antenna wires etc.
aft
from the nav station.
-
- Just a view of the engine
room looking over the motor. The exhaust hose is wrapped in
plastic
to minimze overspray from the painting.
-
- This is the stainless
rudder and exhaust hardware. The rod is to be threaded for lock
nuts
and drilled for cotter keys on either end. Additional pieces to
fit
over the forward rudder edge have also been made.
- Next Page
Home | Beach Cruiser | Badger Builders | Junk Rig
Stuff
Gerald K. Limber
Asheboro, NC
gklimber@triad.rr.com